PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed pour stops around Elev. 5-6 2nd Floor Facing North-East (800x600).jpg Repairing the inside Stairwell -5 (1st Floor)(800x600).jpg Started bathroom roughing at Toilet Room 169 Facing South (800x600).jpg Started installing wire mesh at the 4th Floor Facing North (800x600).jpg Top metal track and electrical conduit at the 1st Floor Facing South-West (800x600).jpg Top metal track at the 2nd floor Facing South (800x600).jpg
Previous pageNext page Top metal track and electrical conduit at the 1st Floor Facing South-West (800x600)
Top metal track and electrical conduit at the 1st Floor Facing South-West (800x600)